Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Detection of Instrumental Drifts in the PEP II LER BPM System

Conference · · Conf.Proc.C070625:4261,2007
During the last PEP-II run a major goal was to bring the Low-Energy Ring optics as close as possible to the design. A large number of BPMs exhibited sudden artificial jumps that interfered with this effort. The source of the majority of these jumps had been traced to the filter-isolator boxes (FIBs) near the BPM buttons. A systematic approach to find and repair the failing units had been developed and implemented. Despite this effort, the instrumental orbit jumps never completely disappeared. To trace the source of this behavior a test setup, using a spare Bergoz MX-BPM processor (kindly provided by SPEAR III at SSRL), was connected in parallel to various PEP-II BPM processors. In the course of these measurements a slow instrumental orbit drift was found which was clearly not induced by a moving positron beam. Based on the size of the system and the limited time before PEP-II closes in Oct.2008, an accelerator improvement project was initiated to install BERGOZ BPM-MX processors close to all sextupoles.
Research Organization:
Stanford Linear Accelerator Center (SLAC)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
919410
Report Number(s):
SLAC-PUB-12974
Conference Information:
Journal Name: Conf.Proc.C070625:4261,2007
Country of Publication:
United States
Language:
English

Similar Records

Validation of PEP-II Resonantly Excited Turn-by-Turn BPM Data
Conference · Thu Jun 28 00:00:00 EDT 2007 · OSTI ID:909292

Identifying Lattice, Orbit, And BPM Errors in PEP-II
Conference · Mon May 09 00:00:00 EDT 2005 · OSTI ID:890843

BPM Breakdown Potential in the PEP-II B-factory Storage Ring Collider
Conference · Tue Feb 09 23:00:00 EST 2010 · OSTI ID:972250