Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Production and test results of SC 3.9-GHz accelerating cavity at Fermilab

Conference · · IEEE Trans.Appl.Supercond.17:1311-1321,2007
OSTI ID:919102
The 3rd harmonic 3.9GHz accelerating cavity was proposed to improve beam performances for TTF-FEL facility. In the frame of collaboration Fermilab will provide DESY with a cryomodule containing a string of four cavities. In addition, a second cryomodule with one cavity will be fabricated for installation in the Fermilab photo-injector, which will be upgraded for the ILC accelerator test facility. In this paper we discuss the status of the cavity and coupler production and the first result of cavity tests. It is hoped that this project will be completed during the first half of 2007 and the cryomodule delivered to DESY in this time span.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
919102
Report Number(s):
FERMILAB-CONF-06-300-AD-TD
Conference Information:
Journal Name: IEEE Trans.Appl.Supercond.17:1311-1321,2007
Country of Publication:
United States
Language:
English

Similar Records

3.9 GHz superconducting accelerating 9-cell cavity vertical test results
Conference · Fri Jun 01 00:00:00 EDT 2007 · Conf.Proc.C070625:2295,2007 · OSTI ID:922032

Vertical and horizontal test results of 3.9-GHz accelerating cavities at FNAL
Conference · Sun Jun 01 00:00:00 EDT 2008 · Conf.Proc.C0806233:mopp135,2008 · OSTI ID:935232

Status of 3.9 GHz superconducting RF cavity technology at Fermilab
Conference · Fri Jun 01 00:00:00 EDT 2007 · Conf.Proc.C070625:2254,2007 · OSTI ID:922022