skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Production and test results of SC 3.9-GHz accelerating cavity at Fermilab

Conference · · IEEE Trans.Appl.Supercond.17:1311-1321,2007
OSTI ID:919102

The 3rd harmonic 3.9GHz accelerating cavity was proposed to improve beam performances for TTF-FEL facility. In the frame of collaboration Fermilab will provide DESY with a cryomodule containing a string of four cavities. In addition, a second cryomodule with one cavity will be fabricated for installation in the Fermilab photo-injector, which will be upgraded for the ILC accelerator test facility. In this paper we discuss the status of the cavity and coupler production and the first result of cavity tests. It is hoped that this project will be completed during the first half of 2007 and the cryomodule delivered to DESY in this time span.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
919102
Report Number(s):
FERMILAB-CONF-06-300-AD-TD; TRN: US0806316
Journal Information:
IEEE Trans.Appl.Supercond.17:1311-1321,2007, Conference: Presented at Applied Superconductivity Conference (ASC 2006), Seattle, Washington, 27 Aug - 1 Sep 2006
Country of Publication:
United States
Language:
English

Similar Records

3.9 GHz superconducting accelerating 9-cell cavity vertical test results
Conference · Fri Jun 01 00:00:00 EDT 2007 · Conf.Proc.C070625:2295,2007 · OSTI ID:919102

Vertical and horizontal test results of 3.9-GHz accelerating cavities at FNAL
Conference · Sun Jun 01 00:00:00 EDT 2008 · Conf.Proc.C0806233:mopp135,2008 · OSTI ID:919102

Transatlantic transport of Fermilab 3.9 GHz cryomodule for TTF/FLASH to DESY
Conference · Sun Jun 01 00:00:00 EDT 2008 · Conf.Proc.C0806233:mopp022,2008 · OSTI ID:919102