Fall Semiannual Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site
The Waste Calcining Facility (WCF) is located at the Idaho Nuclear Technology and Engineering Center. In 1998, the WCF was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the WCF to ensure continued protection of human health and the environment.
- Research Organization:
- Idaho National Laboratory - Idaho Cleanup Project
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- DE-AC07-05ID14516
- OSTI ID:
- 917353
- Report Number(s):
- DOE/ID-11295; TRN: US0804464
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site
Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site
Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site
Technical Report
·
Mon Nov 01 00:00:00 EDT 2010
·
OSTI ID:917353
Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site
Technical Report
·
Thu Jun 01 00:00:00 EDT 2006
·
OSTI ID:917353
Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site
Technical Report
·
Sun May 31 00:00:00 EDT 2009
·
OSTI ID:917353
Related Subjects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
54 ENVIRONMENTAL SCIENCES
29 ENERGY PLANNING
POLICY AND ECONOMY
IDAHO CHEMICAL PROCESSING PLANT
RADIOACTIVE WASTE FACILITIES
CALCINATION
DECOMMISSIONING
GROUTING
CEMENTING
LICENSES
GROUND WATER
MONITORING
INSPECTION
ENVIRONMENTAL PROTECTION
PUBLIC HEALTH
Post Closure Permit
54 ENVIRONMENTAL SCIENCES
29 ENERGY PLANNING
POLICY AND ECONOMY
IDAHO CHEMICAL PROCESSING PLANT
RADIOACTIVE WASTE FACILITIES
CALCINATION
DECOMMISSIONING
GROUTING
CEMENTING
LICENSES
GROUND WATER
MONITORING
INSPECTION
ENVIRONMENTAL PROTECTION
PUBLIC HEALTH
Post Closure Permit