2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).
- Research Organization:
- Idaho National Laboratory - Idaho Cleanup Project
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- DE-AC0705-ID14516
- OSTI ID:
- 912633
- Report Number(s):
- DOE/ID-11310; TRN: US0800432
- Country of Publication:
- United States
- Language:
- English