CHALLENGES ENCOUNTERED DURING THE PROCESSING OF THE BNL ERL 5 CELL ACCELERATING CAVITY
Conference
·
OSTI ID:910379
One of the key components for the Energy Recovery Linac being built by the Electron cooling group in the Collider Accelerator Department is the 5 cell accelerating cavity which is designed to accelerate 2 MeV electrons from the gun up to 15-20 MeV, allow them to make one pass through the ring and then decelerate them back down to 2 MeV prior to sending them to the dump. This cavity was designed by BNL and fabricated by AES in Medford, NY. Following fabrication it was sent to Thomas Jefferson Lab in VA for chemical processing, testing and assembly into a string assembly suitable for shipment back to BNL for integration into the ERL. The steps involved in this processing sequence will be reviewed and the deviations from processing of similar SRF cavities will be discussed. The lessons learned from this process are documented to help future projects where the scope is different from that normally encountered.
- Research Organization:
- Brookhaven National Laboratory
- Sponsoring Organization:
- Doe - Office Of Science
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 910379
- Report Number(s):
- BNL--77340-2007-CP
- Country of Publication:
- United States
- Language:
- English
Similar Records
Challenges Encountered during the Processing of the BNL ERL 5 Cell Accelerating Cavity
Energy Recovery Linac: 5 Cell 704 MHz SRF Cavity
R&D ERL: 5 Cell 704 MHz SRF Cavity
Conference
·
Wed Aug 01 00:00:00 EDT 2007
·
OSTI ID:921651
Energy Recovery Linac: 5 Cell 704 MHz SRF Cavity
Technical Report
·
Thu Dec 31 23:00:00 EST 2009
·
OSTI ID:1061959
R&D ERL: 5 Cell 704 MHz SRF Cavity
Technical Report
·
Thu Dec 31 23:00:00 EST 2009
·
OSTI ID:1013453