Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

RECENT PROCESS IMPROVEMENTS TO INCREASE HLW THROUGHPUT AT THE DWPF

Technical Report ·
DOI:https://doi.org/10.2172/909351· OSTI ID:909351
The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF), the world's largest operating high level waste (HLW) vitrification plant, began stabilizing about 35 million gallons of SRS liquid radioactive waste by-product in 1996. The DWPF has since filled over 2000 canisters with about 4000 pounds of radioactive glass in each canister. In the past few years there have been several process and equipment improvements at the DWPF to increase the rate at which the waste can be stabilized. These improvements have either directly increased waste processing rates or have desensitized the process and therefore minimized process upsets and thus downtime. These improvements, which include glass former optimization, increased waste loading of the glass, the melter heated bellows liner, and glass surge protection software, will be discussed in this paper.
Research Organization:
SRS
Sponsoring Organization:
DOE
DOE Contract Number:
AC09-96SR18500
OSTI ID:
909351
Report Number(s):
WSRC-STI-2007-00084
Country of Publication:
United States
Language:
English