Luminosity Variations Along Bunch Trains in PEP-II
Conference
·
OSTI ID:907712
In the spring of 2005 after a long shut-down, the luminosity of the B-Factory PEP-II decreased along the bunch trains by about 25-30%. There were many reasons studied which could have caused this performance degradation, like a bigger phase transient due to an additional RF station in the Low-Energy-Ring (LER), bad initial vacuum, electron cloud, chromaticity, steering, dispersion in cavities, beam optics, etc. The initial specific luminosity of 4.2 sloped down to 3.2 and even 2.8 for a long train (typical: 130 of 144), later in the run with higher currents and shorter trains (65 of 72) the numbers were more like 3.2 down to 2.6. Finally after steering the interaction region for an unrelated reason (overheated BPM buttons) and the consequential lower luminosity for two weeks, the luminosity slope problem was mysteriously gone. Several parameters got changed and there is still some discussion about which one finally fixed the problem. Among others, likely candidates are: the LER betatron function in x at the interaction point got reduced, making the LER x stronger, dispersion reduction in the cavities, and finding and fixing a partially shorted magnet.
- Research Organization:
- Stanford Linear Accelerator Center (SLAC)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76SF00515
- OSTI ID:
- 907712
- Report Number(s):
- SLAC-PUB-12521
- Country of Publication:
- United States
- Language:
- English
Similar Records
Identifying Lattice, Orbit, And BPM Errors in PEP-II
High-Current Effects in the PEP-II Storage Ring
Effect of TE Mode Power on the PEP II LER BPM System
Conference
·
Mon May 09 00:00:00 EDT 2005
·
OSTI ID:890843
High-Current Effects in the PEP-II Storage Ring
Journal Article
·
Mon Nov 21 23:00:00 EST 2011
· ICFA Beam Dynamics Newsletter
·
OSTI ID:1029905
Effect of TE Mode Power on the PEP II LER BPM System
Conference
·
Fri Aug 26 00:00:00 EDT 2011
· Conf.Proc.C970512:2116,1997
·
OSTI ID:1023262