skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Downhole Vibration Monitoring & Control System

Technical Report ·
DOI:https://doi.org/10.2172/903219· OSTI ID:903219

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and the Phase II final report was issued. Work on Phase III of the project began during the first quarter, 2006. Efforts the current quarter have continued to focus on the manufacture of the prototype and precommercial parts, field test planning and commercialization. The continued extreme lead times quoted by oilfield machine shops for collar components significantly delayed the deployment of the prototype and precommercial units. All parts have now been received for two units, and all but one for the third. Mechanical assembly of the first two systems is complete and the electronics installation and laboratory testing will be finished in April. We have entered into a Memorandum of Understanding with a major US oilfield equipment supplier, which calls for their assisting with our field tests, in cash and in kind. We are close to signing a definitive agreement which includes the purchase of the three precommercial units. We had also signed a CRADA with the Rocky Mountain Oilfield Test Center (RMOTC), and scheduled a test at their site, The RMOTC drilling schedule continues to slip, and the test cannot begin until the first week of May. Based on these factors, we have requested a no-cost extension to July 31, 2007.

Research Organization:
Aps Technology
Sponsoring Organization:
USDOE
DOE Contract Number:
FC26-02NT41664
OSTI ID:
903219
Country of Publication:
United States
Language:
English

Similar Records

Downhole Vibration Monitoring and Control System
Technical Report · Sun Sep 30 00:00:00 EDT 2007 · OSTI ID:903219

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM
Technical Report · Mon May 01 00:00:00 EDT 2006 · OSTI ID:903219

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM
Technical Report · Sat Sep 30 00:00:00 EDT 2006 · OSTI ID:903219