Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Progress towards crab cavity solutions for the ILC

Conference ·
OSTI ID:903136

In order to achieve acceptable luminosity for ILC crossing angles greater than 2 mrad, RF deflection cavities must be used to rotate electron and position bunches leading up to the IP. A bunch that passes through a deflection cavity at a phase where the deflection averages to zero, receives a crab kick leading to a finite rotation at the IP. For a beam energy of 500 GeV and a crossing angle of 20 mrad the required crab kick is about 11.4 MV at 1.3 GHz and 3.8 MV at 3.9 GHz. Cavities are needed on both beams and are likely to be positioned about 12 m before the IP. Any RF phase error between the bunch and the cavity leads to a deflection of the bunch in addition to a rotation of the bunch. Any differential phase error between the cavities leads to differing deflections and consequential loss in luminosity. An updated analysis of system requirements and phase tolerances with respect to original calculations [1] is given. Issues on cavity and frequency choice are discussed.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
903136
Report Number(s):
FERMILAB-CONF-06-541
Country of Publication:
United States
Language:
English

Similar Records

Status of the ILC Crab Cavity Development
Conference · Thu Oct 20 00:00:00 EDT 2011 · OSTI ID:1027790

Design of the ILC Crab Cavity System
Technical Report · Wed Aug 15 00:00:00 EDT 2007 · OSTI ID:915387

Analysis of wakefields in the ILC crab cavity
Conference · Thu Jun 01 00:00:00 EDT 2006 · OSTI ID:903135