Standard technical specifications combustion engineering plants: Bases (Sections 2.0--3.3). Volume 2, Revision 1
This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/6 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes.
- Research Organization:
- Nuclear Regulatory Commission, Washington, DC (United States). Div. of Project Support
- Sponsoring Organization:
- Nuclear Regulatory Commission, Washington, DC (United States)
- OSTI ID:
- 90272
- Report Number(s):
- NUREG--1432-Vol.2-Rev.1; ON: TI95013535
- Country of Publication:
- United States
- Language:
- English
Similar Records
Standard technical specifications, Westinghouse Plants: Bases (Sections 2.0--3.3). Volume 2, Revision 1
Standard technical specifications - Babcock and Wilcox Plants: Bases (Sections 2.0-3.3). Volume 2, Revision 1