Title: Mirror Sub-Assembly End-Effector Design

Abstract

The Optic Assembly Building (OAB) is a facility where large optical mirror units are assembled and installed into Line Replaceable Units (LRUs) for deployment into the National Ignition Facility (NIF) laser system. The New Optics Insertion Device (NOID) is a powered jib crane specially designed to handle large optical assemblies. The NOID arm has three degrees of freedom. it can rotate about the vertical boom, travel up and down the boom, and extend away from and retract in towards the boom. The NOID is used to assist in the assembly of five types of Laser Mirror (LM) LRUs. These five LMs have been creatively named, LM4, LM5, LM6, LM7, and LM8. The LM4 and LM5 LRUs each contain four Mirror Sub-Assemblies (MSAs). The LM6, LM7, and LM8 LRUs each contain 2 MSAs. The MSAs are assembled apart from the LRU and are then installed in the LRU at the LM4-8 workstations. An MSA NOID End-Effector is required to interface with the MSAs and install them into the LRUs. The End-Effector must attach to the robo-hand on the end of the NOID arm. At the time the MSA NOID End-Effector was being designed the NOID, the LM4-5 workstation, and the LM6-8more » workstation were already installed in the OAB. The LRUs and the MSAs designs were also complete. The MSA NOID End-Effector design had to work with the assembly equipment and LRU designs that were already in place.« less

Authors:
Publication Date:
Research Org.:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
902232
Report Number(s):
UCRL-TR-227909
TRN: US0702913
DOE Contract Number:
W-7405-ENG-48
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
42 ENGINEERING; DEGREES OF FREEDOM; DESIGN; LASER MIRRORS; LASERS; MIRRORS; OPTICS; US NATIONAL IGNITION FACILITY

Citation Formats

Butlin, B. Mirror Sub-Assembly End-Effector Design. United States: N. p., 2007. Web. doi:10.2172/902232.
Butlin, B. Mirror Sub-Assembly End-Effector Design. United States. doi:10.2172/902232.
Butlin, B. Mon . "Mirror Sub-Assembly End-Effector Design". United States. doi:10.2172/902232. https://www.osti.gov/servlets/purl/902232.
@article{osti_902232,
title = {Mirror Sub-Assembly End-Effector Design},
author = {Butlin, B},
abstractNote = {The Optic Assembly Building (OAB) is a facility where large optical mirror units are assembled and installed into Line Replaceable Units (LRUs) for deployment into the National Ignition Facility (NIF) laser system. The New Optics Insertion Device (NOID) is a powered jib crane specially designed to handle large optical assemblies. The NOID arm has three degrees of freedom. it can rotate about the vertical boom, travel up and down the boom, and extend away from and retract in towards the boom. The NOID is used to assist in the assembly of five types of Laser Mirror (LM) LRUs. These five LMs have been creatively named, LM4, LM5, LM6, LM7, and LM8. The LM4 and LM5 LRUs each contain four Mirror Sub-Assemblies (MSAs). The LM6, LM7, and LM8 LRUs each contain 2 MSAs. The MSAs are assembled apart from the LRU and are then installed in the LRU at the LM4-8 workstations. An MSA NOID End-Effector is required to interface with the MSAs and install them into the LRUs. The End-Effector must attach to the robo-hand on the end of the NOID arm. At the time the MSA NOID End-Effector was being designed the NOID, the LM4-5 workstation, and the LM6-8 workstation were already installed in the OAB. The LRUs and the MSAs designs were also complete. The MSA NOID End-Effector design had to work with the assembly equipment and LRU designs that were already in place.},
doi = {10.2172/902232},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jan 08 00:00:00 EST 2007},
month = {Mon Jan 08 00:00:00 EST 2007}
}

Technical Report:

Save / Share:
  • The Common Video End Effector System (CVEE), system 62-60, was designed by the Idaho National Engineering Laboratory (INEL) to provide the control interface of the various video end effectors used on the LDUA. The CVEE system consists of a Support Chassis which contains the input and output Opto-22 modules, relays, and power supplies and the Power Chassis which contains the bipolar supply and other power supplies. The combination of the Support Chassis and the Power Chassis make up the CVEE system. The CVEE system is rack mounted in the At Tank Instrument Enclosure (ATIE). Once connected it is controlled usingmore » the LDUA supervisory data acquisition system (SDAS). Video and control status will be displayed on monitors within the LDUA control center.« less
  • This engineering note documents design calculations done for the bayonet feed can platform installed at the far west end of the assembly hall. The platform is mounted off of a cast concrete wall directly south of where the shielding block wall is stacked. A summary of the loading, reaction forces and stresses is shown on the page 3. As can be seen, the calculated stresses are very small, maximum value = 2540 psi. The material used is structural steel tubing, ASTM A500 Gr. B, with a minimum yield strength of 46 ksi and minimum ultimate tensile strength of 58 ksi.more » The reaction forces for the upper two members will be carried together by a 1/2-inch mounting plate. The mounting plate is attached to the wall by four 1/2-inch Hilti wedge anchors. The allowables for each wedge anchor are 2400 lbs. tensile, 1960 lbs. shear. The major reaction load for the top members is a combined 3627 lbs. tensile load which can easily be handled by the four bolt pattern. Some small moment reactions not listed on the summary page add negligible (400 lbs.) force couples to the axial loading. The bottom members are also attached to a mounting plate that is bolted to the wall. See page 15 for Hilti wedge anchor data.« less
  • Between 1952 and 1970, over two million cubic feet of transuranic mixed waste was buried in shallow pits and trenches in the Subsurface Disposal Area at the Idaho National Engineering Laboratory Radioactive Waste Management Complex. Commingled with this two million cubic feet of waste is up to 10 million cubic feet of fill soil. The pits and trenches were constructed similarly to municipal landfills with both stacked and random dump waste forms such as barrels and boxes. The main contaminants are micron-sized particles of plutonium and americium oxides, chlorides, and hydroxides. Retrieval, treatment, and disposal is one of the optionsmore » being considered for the waste. This report describes the results of a field demonstration conducted to evaluate technologies for excavating, and transporting buried transuranic wastes at the INEL, and other hazardous or radioactive waste sites throughout the US Department of Energy complex. The full-scale demonstration, conduced at RAHCO Internationals facilities in Spokane, Washington, in the summer of 1994, evaluated equipment performance and techniques for digging, dumping, and transporting buried waste. Three technologies were evaluated in the demonstration: an Innovative End Effector for dust free dumping, a Telerobotic Transport Vehicle to convey retrieved waste from the digface, and a Remote Operated Excavator to deploy the Innovative End Effector and perform waste retrieval operations. Data were gathered and analyzed to evaluate retrieval performance parameters such as retrieval rates, transportation rates, human factors, and the equipment`s capability to control contamination spread.« less
  • This sampler end effector system functions and requirements document defines the system functions that the end effector must perform as well as the requirements the design must meet. Safety, quality assurance, operations, environmental conditions, and regulatory requirements have been considered. The main purpose of this document is to provide a basis for the end effector engineering, design, and fabrication activities. The document shall be the living reference document to initiate the development activities and will be updated as system technologies are finalized.
  • This gripper end effector system functions and requirements document defines the system functions that the end effector must perform as well as the requirements the design must meet. Safety, quality assurance, operations, environmental conditions, and regulatory requirements have been considered. The main purpose of this document is to provide a basis for the end effector engineering, design, and fabrication activities. The document shall be the living reference document to initiate the development activities and will be updated as system technologies are finalized.