Title: COMPLETION REPORT FOR WELL CLUSTER ER-5-3

Technical Report ·
DOI:https://doi.org/10.2172/901891· OSTI ID:901891

Well Cluster ER-5-3 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This cluster of 3 wells was drilled in 2000 and 2001 as part of a hydrogeologic investigation program in Frenchman Flat. The first borehole in the cluster, Well ER-5-3, was drilled in February and March 2000. A 47.0-centimeter surface hole was drilled and cased off to the depth of 374.8 meters. The hole diameter was decreased to 31.1 centimeters for drilling to a total depth of 794.3 meters within welded ash-flow tuff. A piezometer string with 1 slotted interval was installed in the annulus of the surface casing, open to the saturated alluvium. A completion string with 2 slotted intervals was installed in the main hole, open to saturated alluvium and to the welded tuff aquifer. A second piezometer string with 1 slotted interval open to the welded-tuff aquifer was installed outside the completion string. Well ER-5-3 No.2 was drilled about 30 meters west of the first borehole in March 2000, and was recompleted in March 2001. A 66.0-centimeter hole was drilled and cased off to the depth of 613.8 meters. The hole diameter was decreased to 44.5 centimeters and the borehole was drilled and cased off to the depth of 849.0 meters. The hole diameter was decreased once more to 31.1 centimeters for drilling to a total depth of 1,732.2 meters in dolomite. A completion string open to the dolomite (lower carbonate aquifer) was installed. Well ER-5-3 No.3 was drilled approximately 30 meters north of the first 2 boreholes in February 2001. A 66.0-centimeter hole was drilled and cased off to the depth of 36.6 meters, then the main 25.1-centimeter-diameter hole was drilled to a total depth of 548.6 meters in alluvium. A slotted stainless-steel tubing string was installed in the saturated alluvium. A preliminary composite, static water level was measured at the depth of 282.6 meters, prior to development and hydrologic testing. Detailed lithologic descriptions and stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters, and 120 sidewall samples taken at various depths below 91 meters in Wells ER-5-3 and ER-5-3 No.2, supplemented by geophysical log data. The wells penetrated Quaternary/Tertiary alluvium to the depth of 622.4 meters, and an 8.5-meter-thick basalt flow was encountered within the alluvium. Tertiary tuff was penetrated to the depth of approximately 1,425.9 meters, where the top of the lower carbonate aquifer was tagged in Well ER-5-3 No.2.

Research Organization:
DOE/NNSA NEVADA SITE OFFICE
Sponsoring Organization:
USDOE
DOE Contract Number:
DE-AC08-96NV11718
OSTI ID:
901891
Report Number(s):
DOE/NV/11718-1093; TRN: US200717%%99
Country of Publication:
United States
Language:
English