Title: LCLS XTOD Attenuator System System Concept Report

Abstract

The attenuator system for the Linac Coherent Light Source (LCLS) X-ray Transport, Optics and Diagnostics (XTOD) system has been configured and analyzed by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. The system layout, performance analyses and selection of the vacuum components are presented in this System Conceptual Review (SCR) report. Also included are the plans for prototype, procurement, mechanical integration, and the cost estimates.

Authors:
; ; ; ;
Publication Date:
Research Org.:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
900460
Report Number(s):
UCRL-TR-220712
TRN: US0702336
DOE Contract Number:
W-7405-ENG-48
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
42 ENGINEERING; LIGHT SOURCES; LINEAR ACCELERATORS; OPTICS; PERFORMANCE; PROCUREMENT; TRANSPORT

Citation Formats

Kishiyama, K, Roeben, M, Trent, J, Ryutov, D, and Shen, S. LCLS XTOD Attenuator System System Concept Report. United States: N. p., 2006. Web. doi:10.2172/900460.
Kishiyama, K, Roeben, M, Trent, J, Ryutov, D, & Shen, S. LCLS XTOD Attenuator System System Concept Report. United States. doi:10.2172/900460.
Kishiyama, K, Roeben, M, Trent, J, Ryutov, D, and Shen, S. Wed . "LCLS XTOD Attenuator System System Concept Report". United States. doi:10.2172/900460. https://www.osti.gov/servlets/purl/900460.
@article{osti_900460,
title = {LCLS XTOD Attenuator System System Concept Report},
author = {Kishiyama, K and Roeben, M and Trent, J and Ryutov, D and Shen, S},
abstractNote = {The attenuator system for the Linac Coherent Light Source (LCLS) X-ray Transport, Optics and Diagnostics (XTOD) system has been configured and analyzed by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. The system layout, performance analyses and selection of the vacuum components are presented in this System Conceptual Review (SCR) report. Also included are the plans for prototype, procurement, mechanical integration, and the cost estimates.},
doi = {10.2172/900460},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Apr 12 00:00:00 EDT 2006},
month = {Wed Apr 12 00:00:00 EDT 2006}
}

Technical Report:

Save / Share:
  • The vacuum system of the XVTS (X-Ray Vacuum Transport System) for the LCLS (Linac Coherent Light Source) XTOD (X-ray Transport, Optics and Diagnostics) system has been analyzed and configured by the Lawrence Livermore National Laboratory's NTED (New Technologies Engineering Division) as requested by the SLAC/LCLS program. The system layout, detailed analyses and selection of the vacuum components for the XTOD tunnel section are presented in this preliminary design report. The vacuum system was analyzed and optimized using a coupled gas load balance model of sub-volumes of the components to be evacuated. Also included are the plans for procurement, mechanical integration,more » and the cost estimates.« less
  • The design of the X-Ray Vacuum Transport System (XVTS) for the Linac Coherent Light Source (LCLS) X-ray Transport, Optics and Diagnostics (XTOD) system has been analyzed and configured by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. A preliminary design review was held on 11/14/05 [1][2]. This FDR (Final Design Report) presents system configuration, detailed analyses and selection of the mechanical and electrical components for the XTOD tunnel section, as well as the response to all issues raised in the review committee report. Also included are the plans for procurement, mechanical integration,more » schedule and the cost estimates. It should be noticed that, after the XVTS PDR, LCLS management has decided to lower the number of beamlines from three to one, and shorten the tunnel length from 212 m to 184 m. [3][4] The final design of XVTS system is completed. The major subjects presented in this report are: (1) Design of the complete system. (2) System analysis results. (3) ES&H issues and plan. (4) Project cost estimates and schedule.« less
  • The vacuum system of the X-Ray Vacuum Transport System (XVTS) for the Linac Coherent Light Source (LCLS) X-ray Transport, Optics and Diagnostics (XTOD) system has been analyzed and configured by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. The preliminary system layout, detailed analyses and suggested selection of the vacuum components for the XTOD tunnel section are presented in the preliminary design report [1]. This document briefly reviews the preliminary design and provides engineering specifications for the system, which can be used as 'design to' specifications for the final design. Also includedmore » are the requirements of plans for procurement, mechanical integration, schedule and the cost estimates.« less
  • The possibility of increasing the apertures of the LCLS gas attenuator/gas detector system is considered. It is shown that increase of the apertures from 3 to 6 mm, together with 4-fold reduction of the operation pressure does not adversely affect the vacuum conditions upstream or downstream. No change of the pump speed and the lengths of the differential pumping cells is required. One minor modification is the use of 1.5 cm long tubular apertures in the end cells of the differential pumping system. Reduction of the pressure does not affect performance of the gas attenuator/gas detector system at the FELmore » energies below, roughly, 2 keV. Some minor performance degradation occurs at higher energies.« less
  • The possibility of increasing the apertures of the LCLS gas attenuator/gas detector system is considered. It is shown that increase of the apertures from 3 to 6 mm, together with 4-fold reduction of the operation pressure does not adversely affect the vacuum conditions upstream or downstream. No change of the pump speed and the lengths of the differential pumping cells is required. One minor modification is the use of 1.5 cm long tubular apertures in the end cells of the differential pumping system. Reduction of the pressure does not affect performance of the gas attenuator/gas detector system at the FELmore » energies below, roughly, 2 keV. Some minor performance degradation occurs at higher energies.« less