Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

Technical Report ·
DOI:https://doi.org/10.2172/897322· OSTI ID:897322

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

Research Organization:
Bonneville Power Administration (BPA), Portland, OR
Sponsoring Organization:
USDOE
OSTI ID:
897322
Report Number(s):
DOE/EIS-0374
Country of Publication:
United States
Language:
English