Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

CDF level 2 trigger upgrade

Journal Article · · IEEE Trans.Nucl.Sci.53:653-658,2006

We describe the new CDF Level 2 Trigger, which was commissioned during Spring 2005. The upgrade was necessitated by several factors that included increased bandwidth requirements, in view of the growing instantaneous luminosity of the Tevatron, and the need for a more robust system, since the older system was reaching the limits of maintainability. The challenges in designing the new system were interfacing with many different upstream detector subsystems, processing larger volumes of data at higher speed, and minimizing the impact on running the CDF experiment during the system commissioning phase. To meet these challenges, the new system was designed around a general purpose motherboard, the PULSAR, which is instrumented with powerful FPGAs and modern SRAMs, and which uses mezzanine cards to interface with upstream detector components and an industry standard data link (S-LINK) within the system.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
897180
Report Number(s):
FERMILAB-PUB-06-400-E
Journal Information:
IEEE Trans.Nucl.Sci.53:653-658,2006, Journal Name: IEEE Trans.Nucl.Sci.53:653-658,2006
Country of Publication:
United States
Language:
English

Similar Records

The GigaFitter: Performance at CDF and Perspectives for Future Applications
Conference · Thu Dec 31 23:00:00 EST 2009 · J.Phys.Conf.Ser. · OSTI ID:1974000

The CDF level 2 calorimetric trigger upgrade
Journal Article · Wed Dec 31 23:00:00 EST 2008 · Nucl.Instrum.Meth.A598:331-333,2009 · OSTI ID:947208

Level-2 Calorimeter Trigger Upgrade at CDF
Conference · Sun Apr 01 00:00:00 EDT 2007 · OSTI ID:909889