Electron cooling of 8-GeV antiprotons at Fermilab's Recycler: Results and operational implications
Electron cooling of 8 GeV antiprotons at Fermilab's Recycler storage ring is now routinely used in the collider operation. It requires a 0.1-0.5 A, 4.3 MeV dc electron beam and is designed to increase the longitudinal phase-space density of the circulating antiproton beam. This paper briefly describes the characteristics of the electron beam that were achieved to successfully cool antiprotons. Then, results from various cooling force measurements along with comparison to a nonmagnetized model are presented. Finally, operational aspects of the implementation of electron cooling at the Recycler are discussed, such as adjustments to the cooling rate and the influence of the electron beam on the antiproton beam lifetime.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 892385
- Report Number(s):
- FERMILAB-CONF-06-098-AD
- Country of Publication:
- United States
- Language:
- English
Similar Records
Status of high energy electron cooling in FNAL's Recycler Ring
Electron cooling rates characterization at Fermilab's Recycler