Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Recriticality of a BWR core during reflood after control blade meltdown

Journal Article · · Transactions of the American Nuclear Society
OSTI ID:89175
In nuclear reactor safety research, the question of the possible consequences of delayed core reflood during severe accidents or anticipated transient without scram transients in boiling water reactors (BWRs) has been raised. One can envisage a very low probability accident scenario leading to core uncovery and core heat-up, followed by control blade melting and subsequential delayed reflooding of the core with unborated water before its degradation. Reflooding of the hot core causes significant increases in the peak heating, melting, and hydrogen production rates, thus increasing the probability of core degradation. However, as has been established, debris beds formed from shattered fuel rods and quenched fuel melt will be undermoderated. The reflood process of a voided, intact core was examined using the TRAC/BFI CODE.
OSTI ID:
89175
Report Number(s):
CONF-941102--
Journal Information:
Transactions of the American Nuclear Society, Journal Name: Transactions of the American Nuclear Society Vol. 71; ISSN 0003-018X; ISSN TANSAO
Country of Publication:
United States
Language:
English