skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XVI; Alternative Designs for Future Adult PIT-Tag Detection Studies, 2000 Technical Report.

Technical Report ·
DOI:https://doi.org/10.2172/891526· OSTI ID:891526
;  [1]
  1. University of Washington, School of Fisheries, Seattle, WA

In the advent of the installation of a PIT-tag interrogation system in the Cascades Island fish ladder at Bonneville Dam (BON), and other CRB dams, this overview describes in general terms what can and cannot be estimated under seven different scenarios of adult PIT-tag detection capabilities in the CRB. Moreover, this overview attempted to identify minimal adult PIT-tag detection configurations required by the ten threatened Columbia River Basin (CRB) chinook and steelhead ESUs. A minimal adult PIT-tag detection configuration will require the installation of adult PIT-tag detection facilities at Bonneville Dam and another dam above BON. Thus, the Snake River spring/summer and fall chinook salmon, and the Snake River steelhead will require a minimum of three dams with adult PIT-tag detection capabilities to guarantee estimates of ''ocean survival'' and at least of one independent, in-river returning adult survival (e.g., adult PIT-tag detection facilities at BON and LGR dams and at any other intermediary dam such as IHR). The Upper Columbia River spring chinook salmon and steelhead will also require a minimum of three dams with adult PIT-tag detection capabilities: BON and two other dams on the BON-WEL reach. The current CRB dam system configuration and BPA's and COE's commitment to install adult PIT-tag detectors only in major CRB projects will not allow the estimation of an ''ocean survival'' and of any in-river adult survival for the Lower Columbia River chinook salmon and steelhead. The Middle Columbia River steelhead ESU will require a minimum of two dams with adult PIT-tag detection capabilities: BON and another upstream dam on the BON-McN reach. Finally, in spite of their importance in terms of releases, PIT-tag survival studies for the Upper Willamette chinook and Upper Willamette steelhead ESUs cannot be perform with the current CRB dam system configuration and PIT-tag detection capabilities.

Research Organization:
University of Washington, School of Fisheries, Seattle, WA
Sponsoring Organization:
United States. Bonneville Power Administration. Environment, Fish and Wildlife.
DOE Contract Number:
1990BI02341
OSTI ID:
891526
Report Number(s):
DOE/BP-02341-15; R&D Project: 198910700; TRN: US200622%%249
Country of Publication:
United States
Language:
English