Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Bunch Pattern With More Bunches in PEP-II

Conference ·
OSTI ID:890845
The number of bunches in the PEP-II B-Factory has increased over the years. The luminosity has followed roughly linearly that increase or even faster since we have also lowered the spot size at the interaction point. The recent steps from 939 bunches in June of 2003 to about 1320 in February 2004 (and 1585 in May) should have been followed by a similar rise in luminosity from 6.5 {center_dot} 10{sup 33} l/cm{sup 2} {center_dot} 1/s to 9.1 {center_dot} 10{sup 33} 1/cm{sup 2} {center_dot} 1/s (or even 11 {center_dot} 10{sup 33} 1/cm{sup 2} {center_dot} 1/s in May). This didn't happen so far and a peak luminosity of ''only'' 7.3 {center_dot} 10{sup 33} 1/cm{sup 2} {center_dot} 1/s (or 9.2 {center_dot} 10{sup 33} 1/cm{sup 2} {center_dot} 1/s in May) was achieved with less bunch currents. By filling the then partially filled by-3 pattern to a completely filled by-3 pattern (1133 bunches) we should get 7.9 {center_dot} 10{sup 33} 1/cm{sup 2} {center_dot} 1/s with scaled currents of 1400 mA (HER) on 1900 mA (LER). We were typically running about 1300 mA on 1900 mA with 15% more bunches in February (and 1550 mA on 2450 mA with 40% more bunches in May). The bunch pattern is typically by-2 with trains of 14 bunches out of 18 (or 67 out of 72). The parasitic beam crossings or electron cloud effects might play a role at about a 5-10% luminosity loss. Also the LER x-tune could be pushed further down to the 1/2 integer in the by-3 pattern. On the other hand, we might not push the beam-beam tune shift as hard as in June of 2003 since we have started trickle injection and therefore might avoid the highest peak luminosity which probably has a higher background.
Research Organization:
Stanford Linear Accelerator Center (SLAC)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
890845
Report Number(s):
SLAC-PUB-11163
Country of Publication:
United States
Language:
English

Similar Records

Status Report and Future Plans for the PEP-II B Factory
Technical Report · Thu Apr 12 00:00:00 EDT 2001 · OSTI ID:784907

Complicated Bunch Pattern in PEP-II
Technical Report · Fri Aug 09 00:00:00 EDT 2002 · OSTI ID:800001

Towards Achieving the Design Number of Bunches in PEP-II
Technical Report · Wed Jun 28 00:00:00 EDT 2000 · OSTI ID:763806