Pleasant Bayou Operations Brazoria County, Texas
Conference
·
OSTI ID:890501
This project will demonstrate the Hybrid Cycle Concept for electricity generation using geopressured-geothermal resources. The test is scheduled to be a minimum of one year, which may be extended. The majority of the equipment came from the DOE facility at East Mesa, CA. The hybrid cycle has been designed for 10,800 BPD brine and 220,000 SCFD of gas. The power output will be about one megawatt, which will be sold to Houston Lighting and Power Company. An important research objective is to determine the size and ultimate production capability of the geopressured-geothermal reservoir. The long-term deliverability of these type reservoirs is a significant factor in determining the ultimate economic capability of these systems.
- Research Organization:
- Easton Operating Company, Inc., Houston, Texas
- Sponsoring Organization:
- USDOE
- OSTI ID:
- 890501
- Report Number(s):
- CONF-890352--16
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pleasant Bayou area, Brazoria County, Texas, brine injection experience
Pleasant Bayou geopressured/geothermal testing project, Brazoria County, Texas. Final report
Final report for the geothermal well site restoration and plug and abandonment of wells: DOE Pleasant Bayou test site, Brazoria County, Texas
Conference
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:7369482
Pleasant Bayou geopressured/geothermal testing project, Brazoria County, Texas. Final report
Technical Report
·
Mon Jul 01 00:00:00 EDT 1985
·
OSTI ID:5828214
Final report for the geothermal well site restoration and plug and abandonment of wells: DOE Pleasant Bayou test site, Brazoria County, Texas
Technical Report
·
Sat Mar 12 23:00:00 EST 1994
·
OSTI ID:896325