Low Wind Speed Technology Phase II: Design and Demonstration of On-Site Fabrication of Fluted-Steel Towers Using LITS-Form(TM) Process
This fact sheet describes NREL's subcontract with Native American Technologies to develop a new method of metal plate forming to produce wind turbine towers.
- Research Organization:
- National Renewable Energy Laboratory (NREL), Golden, CO.
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC36-99GO10337
- OSTI ID:
- 886841
- Report Number(s):
- DOE/GO-102006-2300
- Country of Publication:
- United States
- Language:
- English
Similar Records
Low Wind Speed Technology Phase I: Evaluation of Design and Construction Approaches for Economical Hybrid Steel/Concrete Wind Turbine Towers; BERGER/ABAM Engineers Inc.
Low Wind Speed Technology Phase II: LIDAR for Turbine Control
Low Wind Speed Technology Phase II: Development of a 2-MW Direct-Drive Wind Turbine for Low Wind Speed Sites; Northern Power Systems
Technical Report
·
Tue Feb 28 23:00:00 EST 2006
·
OSTI ID:878490
Low Wind Speed Technology Phase II: LIDAR for Turbine Control
Technical Report
·
Thu Jun 01 00:00:00 EDT 2006
·
OSTI ID:886838
Low Wind Speed Technology Phase II: Development of a 2-MW Direct-Drive Wind Turbine for Low Wind Speed Sites; Northern Power Systems
Technical Report
·
Tue Feb 28 23:00:00 EST 2006
·
OSTI ID:878477