Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Design, implementation, and completion of a horizontal tight gas wellbore - case study: Green River Basin, Wyoming

Journal Article · · AAPG Bulletin
OSTI ID:88680
; ;  [1]
  1. Amoco Production Co., Denver, CO (United States); and others

In September, 1993 Amoco Production Company began drilling the Champlin 254B No. 2H, a horizontal well test located near the Wamsutter Arch, southwestem Wyoming. The Champlin 254B No. 2H was designed to confirm a fractured reservoir concept and to test the economic viability of a horizontal wellbore in the Almond fm.. The wellbore was designed to determine real-time, the fracture direction and the optimum horizontal leg direction within the confines of the drilling permit. A deviated pilot hole was drilled to optimize our ability to cross vertical natural fractures. MWD gamma-ray, oriented core, a vertical seismic profile, Formation Microimager, and a robust suite of electric logs were obtained to gain information on the presence and orientation of fractures before kickoff for the horizontal leg. Electromagnetic goniometry was used onsite to orient fractures in core. Log and core data were consistent and a wellbore trajectory of due South was chosen. A two thousand foot horizontal wellbore was drilled, 1700 feet of which is in the upper Almond formation productive zone. MWD gamma-ray, three 30` cores, Formation Microscanner logs, and a density-neutron log were obtained in the horizontal hole. This wellbore was completed open-hole with a stabilized gas rate of 1 mmcfd. In May, 1994 a portion of the original wellbore collapsed and a replacement horizontal leg was drilled. Oil-based mud and rotary BOP`s were utilized to minimize damage and invasion to the reservoir. Reservoir pressures encountered in the redrill indicate that depletion along the original wellbore had begun. The redrill was completed open-hole with a pre-perforated (every third joint) 5 1/2 inches liner and also stabilized at a rate of 1 mmcfd.

OSTI ID:
88680
Report Number(s):
CONF-9507131--
Journal Information:
AAPG Bulletin, Journal Name: AAPG Bulletin Journal Issue: 6 Vol. 79; ISSN 0149-1423; ISSN AABUD2
Country of Publication:
United States
Language:
English

Similar Records

Drilling and early testing of a sidetrack from the slant hole completion test well
Conference · Fri May 01 00:00:00 EDT 1992 · OSTI ID:138829

Rock characterization in reservoirs targeted for horizontal drilling
Journal Article · Tue Nov 30 23:00:00 EST 1993 · JPT, Journal of Petroleum Technology; (United States) · OSTI ID:5665553

Drilling and early testing of a sidetrack from the slant hole completion test well
Conference · Mon Jun 01 00:00:00 EDT 1992 · OSTI ID:10147392