EBR-II secondary sodium loop Plugging Temperature Indicator control system upgrade
Conference
·
OSTI ID:88481
The Experimental Breeder Reactor II (EBR-II) secondary sodium coolant loop Plugging Temperature Indicator (PTI) control system was upgraded in 1993 to a real-time computer based system. This was done to improve control, to remove obsolete and high maintenance equipment, and to provide a graphical CRT based operator interface. A goal was to accomplish this inexpensively using small, reliable computer and display hardware with a minimum of purchased software. This paper describes the PTI system, the upgraded control system and its operator interface, and development methods and tools. The paper then assesses how well the system met its goals, discusses lessons learned and operational improvements noted, and provides some recommendations and suggestions on applying small real-time control systems of this type.
- Research Organization:
- Argonne National Lab., Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 88481
- Report Number(s):
- ANL/IFR/CP--83964; CONF-950564--2; ON: DE95013471
- Country of Publication:
- United States
- Language:
- English
Similar Records
EBR-II Cover Gas Cleanup System upgrade process control system structure
EBR-II Cover Gas Cleanup System upgrade process control system structure
Plugging temperature indicator computer simulation
Conference
·
Fri May 01 00:00:00 EDT 1992
·
OSTI ID:10140802
EBR-II Cover Gas Cleanup System upgrade process control system structure
Conference
·
Tue Dec 31 23:00:00 EST 1991
·
OSTI ID:5660983
Plugging temperature indicator computer simulation
Journal Article
·
Mon Dec 30 23:00:00 EST 1996
· Transactions of the American Nuclear Society
·
OSTI ID:436894