Unreviewed Disposal Question Evaluation: Disposal of 0.2 Curie/gallon MAVRC Project Equipment in Vault 1
The Saltstone Facility 0.2 Curie/gallon MAVRC (Mixer At Vault Roof Concept) Project will utilize various pieces of process equipment that have not been analyzed from a Performance Assessment perspective for future disposal. The proposed activity will involve the disposal of Saltstone process equipment in an empty Vault 1 cell and encasing the equipment in clean (nonradioactive) grout. An examination of this activity indicates that the disposal of up to 20 pieces of each specified component should not affect the assumptions, results, and conclusions of the approved Performance Assessment (PA) and Special Analyses (SA) for Saltstone, and that the activity is within the bounds of the Disposal Authorization Statement (DAS).
- Research Organization:
- Savannah River Site (SRS), Aiken, SC
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- DE-AC09-96SR18500
- OSTI ID:
- 881437
- Report Number(s):
- WSRC-TR-2005-00323; TRN: US0603084
- Country of Publication:
- United States
- Language:
- English
Similar Records
Response to requests by FMF and DWPF concerning disposal of FMF saltstone drums in Z-Area vaults
Special Analysis: Revision of Saltstone Vault 4 Disposal Limits (U)