Low Wind Speed Technology Phase I: Prototype Multi-Megawatt Low Wind Speed Turbine; General Electric Wind Energy, LLC
This fact sheet describes a subcontract with GE Wind Energy to develop an advanced prototype turbine to significantly reduce energy costs (COE) in low wind speed environments.
- Research Organization:
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC36-99-GO10337
- OSTI ID:
- 878484
- Report Number(s):
- DOE/GO-102006-2196; TRN: US200611%%294
- Resource Relation:
- Related Information: Wind Energy Program Technology Portfolio (Fact Sheet)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Low Wind Speed Turbine Project Phase II: The Application of Medium-Voltage Electrical Apparatus to the Class of Variable Speed Multi-Megawatt Low Wind Speed Turbines; 15 June 2004--30 April 2005
Low Wind Speed Technology Phase II: Reducing Cost of Energy Through Rotor Aerodynamics Control; Global Energy Concepts, LLC
Low Wind Speed Technology Phase II: Development of a 2-MW Direct-Drive Wind Turbine for Low Wind Speed Sites; Northern Power Systems
Technical Report
·
Tue Nov 01 00:00:00 EST 2005
·
OSTI ID:878484
Low Wind Speed Technology Phase II: Reducing Cost of Energy Through Rotor Aerodynamics Control; Global Energy Concepts, LLC
Technical Report
·
Wed Mar 01 00:00:00 EST 2006
·
OSTI ID:878484
Low Wind Speed Technology Phase II: Development of a 2-MW Direct-Drive Wind Turbine for Low Wind Speed Sites; Northern Power Systems
Technical Report
·
Wed Mar 01 00:00:00 EST 2006
·
OSTI ID:878484