Cavity Preparation/assembly Techniques and Impact on Q, Realistic Q - Factors in a Module, Review of Modules
Conference
·
OSTI ID:876584
This contribution summarizes the surface preparation procedures for niobium cavities presently used both in laboratory experiments and for modules, such as buffered chemical polishing (BCP), electropolishing (EP), high pressure ultrapure water rinsing (HPR), CO{sub 2} snow cleaning and high temperature heat treatments for hydrogen degassing or postpurification. The impact of surface treatments and the degree of cleanliness during assembly procedures on cavity performance (Q - value and accelerating gradient E{sub acc}) will be discussed. In addition, an attempt will be made to summarize the experiences made in module assemblies in different labs/projects such as DESY(TTF), Jlab (Upgrade) and SNS.
- Research Organization:
- Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA
- Sponsoring Organization:
- USDOE - Office of Energy Research (ER)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 876584
- Report Number(s):
- JLAB-ACP-05-329; DOE/ER/40150-3795
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hydroforming of Tesla Cavities at Desy
Preliminary Test Results from 650 MHz Single Cell Medium Beta Cavities for Project X
JLab SRF Institute (SRFI) Trip 8/31/04 – 9/1/04: Final Report
Conference
·
Sat Jul 01 00:00:00 EDT 2000
·
OSTI ID:839250
Preliminary Test Results from 650 MHz Single Cell Medium Beta Cavities for Project X
Conference
·
Fri Jul 01 00:00:00 EDT 2011
·
OSTI ID:1057759
JLab SRF Institute (SRFI) Trip 8/31/04 – 9/1/04: Final Report
Technical Report
·
Sun May 01 00:00:00 EDT 2005
·
OSTI ID:1061799