ESF SOUTH PORTAL BOX-CUT/HIGHWALL STABILITY ANALYSIS (SCPB:N/A)
The main purpose and objective of this analysis is to design a Box-Cut at the ESF South Portal to accommodate the Tunnel Boring Machine's (TBM) exit at the conclusion of the ESF Main Loop construction. The stability of the Highwall and the sidewalls at the Box-Cut are assessed using analytical methods by numerical modeling techniques. A ground reinforcement system for the South Ramp Box-Cut slopes will be recommended. This report summarizes the results of the analyses and provides the details of the recommended ground reinforcement system for the Box-Cut slopes at the South Portal. The reinforcement design details are then incorporated into design output documents for implementation in the field. Method of excavation for the Box-Cut is also discussed and a recommendation is provided in this analysis.
- Research Organization:
- Office of Scientific and Technical Information, Oak Ridge, TN
- Sponsoring Organization:
- USDOE
- OSTI ID:
- 875346
- Report Number(s):
- BABEE0000-01717-0200-00013
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tunnel boring machine applications; Yucca Mountain Exploratory Studies Facility
The exploratory studies facility (ESF) at Yucca Mountain - Description and status
Constructing the Exploratory Studies Facility at Yucca Mountain
Conference
·
Sat Oct 31 23:00:00 EST 1992
·
OSTI ID:140875
The exploratory studies facility (ESF) at Yucca Mountain - Description and status
Technical Report
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:111731
Constructing the Exploratory Studies Facility at Yucca Mountain
Conference
·
Wed May 01 00:00:00 EDT 1996
·
OSTI ID:226090