skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Post waterflood CO{sub 2} miscible flood in light oil, fluvial-dominated deltaic reservoir. Annual report, October 1, 1993--September 30, 1994

Technical Report ·
DOI:https://doi.org/10.2172/86915· OSTI ID:86915

Texaco Exploration and Production Inc. (TEPI) and the U.S. Department of Energy (DOE) entered into a cost sharing cooperative agreement to conduct an Enhanced Oil Recovery demonstration project at Port Neches. The field is located in Orange County near Beaumont, Texas. The project will demonstrate the effectiveness of the CO{sub 2}, miscible process in Fluvial Dominated Deltaic reservoirs. It will also evaluate the use of horizontal CO{sub 2} injection wells to improve the overall sweep efficiency. A data base of FDD reservoirs for the gulf coast region will be developed by LSU, using a screening model developed by Texaco Research Center in Houston. Finally, the results and the information gained from this project will be disseminated throughout the oil industry via a series of SPE papers and industry open forums. Reservoir characterization efforts for the Marginulina sand, are in progress utilizing conventional and advanced technologies including 3-D seismic. Sidewall and conventional. cores were cut and analyzed, lab tests were conducted on reservoir fluids, reservoir BHP pressure and reservoir voidage were monitored as shown. Texaco is utilizing the above data to develop a Stratamodel to best describe and characterize the reservoir and to use it as an input for the compositional simulator. The current compositional model is being revised to integrate the new data from the 3-D seismic and field performance under CO{sub 2} injection, to ultimately develop an accurate economic model. All facilities work has been completed and placed in service including the CO{sub 2} pipeline and metering equipment, CO{sub 2} injection and production equipment, water injection equipment, well work and injection/production lines. The horizontal injection well was drilled and completed on January 15, 1994. CO{sub 2} purchases from Cardox continue at an average rate of 3600 MCFD. The CO{sub 2} is being injected at line pressure of 1350 psi.

Research Organization:
Texaco Exploration and Production, Inc., New Orleans, LA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC22-93BC14960
OSTI ID:
86915
Report Number(s):
DOE/BC/14960-8; ON: DE95000173; TRN: 95:005570
Resource Relation:
Other Information: PBD: Jul 1995
Country of Publication:
United States
Language:
English