Title: Commissioning of the LHC Beam Transfer Line TI 8

Conference ·
OSTI ID:861086

The first of the two LHC transfer lines was commissioned in autumn 2004. Beam reached an absorber block located some 2.5 km downstream of the SPS extraction point at the first shot, without the need of any threading. The hardware preparation and commissioning phase will be summarized, followed by a description of the beam tests and their results regarding optics and other line parameters, including the experience gained with beam instrumentation, the control system and the machine protection equipment.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE - Office of Energy Research (ER)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
861086
Report Number(s):
JLAB-ACP-05-426; DOE/ER/40150-3655; TRN: US0600210
Resource Relation:
Conference: PAC 2005, 16-20 May 2005, Knoxville, Tennessee
Country of Publication:
United States
Language:
English