Title: Plutonium-238 Transuranic Waste Decision Analysis

Abstract

Five transuranic (TRU) waste sites in the Department of Energy (DOE) complex, collectively, have more than 2,100 cubic meters of Plutonium-238 (Pu-238) TRU waste that exceed the wattage restrictions of the Transuranic Package Transporter-II (TRUPACT-11). The Waste Isolation Pilot Plant (WIPP) is being developed by the DOE as a repository for TRU waste. With the Waste Isolation Pilot Plant (WIPP) opening in 1999, these sites are faced with a need to develop waste management practices that will enable the transportation of Pu-238 TRU waste to WIPP for disposal. This paper describes a decision analysis that provided a logical framework for addressing the Pu-238 TRU waste issue. The insights that can be gained by performing a formalized decision analysis are multifold. First and foremost, the very process. of formulating a decision tree forces the decision maker into structured, logical thinking where alternatives can be evaluated one against the other using a uniform set of criteria. In the process of developing the decision tree for transportation of Pu-238 TRU waste, several alternatives were eliminated and the logical order for decision making was discovered. Moreover, the key areas of uncertainty for proposed alternatives were identified and quantified. The decision analysis showed that themore » DOE can employ a combination approach where they will (1) use headspace gas analyses to show that a fraction of the Pu-238 TRU waste drums are no longer generating hydrogen gas and can be shipped to WIPP ''as-is'', (2) use drums and bags with advanced filter systems to repackage Pu-238 TRU waste drums that are still generating hydrogen, and (3) add hydrogen getter materials to the inner containment vessel of the TRUPACT-11to relieve the build-up of hydrogen gas during transportation of the Pu-238 TRU waste drums.« less

Authors:
; ;
Publication Date:
Research Org.:
Sandia National Labs., Albuquerque, NM (US); Sandia National Labs., Livermore, CA (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
8442
Report Number(s):
SAND98-2629C
TRN: US0102636
DOE Contract Number:  
AC04-94AL85000
Resource Type:
Conference
Resource Relation:
Conference: Waste Management '99, Tucson, AZ (US), 02/28/1999--03/04/1999; Other Information: PBD: 29 Jun 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ALPHA-BEARING WASTES; GETTERS; HYDROGEN; PLUTONIUM 238; WIPP; WASTE TRANSPORTATION; DECISION TREE ANALYSIS; GAS ANALYSIS; FILTERS; PACKAGING; RADIOACTIVE WASTE MANAGEMENT

Citation Formats

Brown, Mike, Lechel, David J., and Leigh, C.D. Plutonium-238 Transuranic Waste Decision Analysis. United States: N. p., 1999. Web.
Brown, Mike, Lechel, David J., & Leigh, C.D. Plutonium-238 Transuranic Waste Decision Analysis. United States.
Brown, Mike, Lechel, David J., and Leigh, C.D. Tue . "Plutonium-238 Transuranic Waste Decision Analysis". United States. https://www.osti.gov/servlets/purl/8442.
@article{osti_8442,
title = {Plutonium-238 Transuranic Waste Decision Analysis},
author = {Brown, Mike and Lechel, David J. and Leigh, C.D.},
abstractNote = {Five transuranic (TRU) waste sites in the Department of Energy (DOE) complex, collectively, have more than 2,100 cubic meters of Plutonium-238 (Pu-238) TRU waste that exceed the wattage restrictions of the Transuranic Package Transporter-II (TRUPACT-11). The Waste Isolation Pilot Plant (WIPP) is being developed by the DOE as a repository for TRU waste. With the Waste Isolation Pilot Plant (WIPP) opening in 1999, these sites are faced with a need to develop waste management practices that will enable the transportation of Pu-238 TRU waste to WIPP for disposal. This paper describes a decision analysis that provided a logical framework for addressing the Pu-238 TRU waste issue. The insights that can be gained by performing a formalized decision analysis are multifold. First and foremost, the very process. of formulating a decision tree forces the decision maker into structured, logical thinking where alternatives can be evaluated one against the other using a uniform set of criteria. In the process of developing the decision tree for transportation of Pu-238 TRU waste, several alternatives were eliminated and the logical order for decision making was discovered. Moreover, the key areas of uncertainty for proposed alternatives were identified and quantified. The decision analysis showed that the DOE can employ a combination approach where they will (1) use headspace gas analyses to show that a fraction of the Pu-238 TRU waste drums are no longer generating hydrogen gas and can be shipped to WIPP ''as-is'', (2) use drums and bags with advanced filter systems to repackage Pu-238 TRU waste drums that are still generating hydrogen, and (3) add hydrogen getter materials to the inner containment vessel of the TRUPACT-11to relieve the build-up of hydrogen gas during transportation of the Pu-238 TRU waste drums.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jun 29 00:00:00 EDT 1999},
month = {Tue Jun 29 00:00:00 EDT 1999}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: