High Power Lasing in the IR Upgrade FEL at Jefferson Lab
Conference
·
OSTI ID:841439
We report on progress in commissioning the IR Upgrade facility at Jefferson Lab. Operation at high power has been demonstrated at 5.7 microns with over 8.5 kW of continuous power output, 10 kW for 1 second long pulses, and CW recirculated electron beam power of over 1.1 MW. We report on the features and limitations of the present design and report on the path to getting even higher powers.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 841439
- Report Number(s):
- JLAB-ACT-04-15; DOE/ER/40150-3470
- Country of Publication:
- United States
- Language:
- English
Similar Records
First lasing of the IR upgrade FEL at Jefferson lab
First Lasing of the Jefferson Lab IR Demo FEL
Beam breakup simulations for the Jefferson Lab FEL upgrade
Journal Article
·
Sun Aug 01 00:00:00 EDT 2004
· Nuclear Instruments and Methods in Physics Research Section A
·
OSTI ID:836642
First Lasing of the Jefferson Lab IR Demo FEL
Journal Article
·
Sat May 01 00:00:00 EDT 1999
· Nuclear Instruments and Methods in Physics Research Section A
·
OSTI ID:791572
Beam breakup simulations for the Jefferson Lab FEL upgrade
Conference
·
Wed Mar 31 23:00:00 EST 1999
·
OSTI ID:754648