skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: REALTIME MONITORING OF PIPELINES FOR THIRD-PARTY CONTACT

Technical Report ·
DOI:https://doi.org/10.2172/839568· OSTI ID:839568

Third-party contact with pipelines (typically caused by contact with a digging or drilling device) can result in mechanical damage to the pipe, in addition to coating damage that can initiate corrosion. Because this type of damage often goes unreported and can lead to eventual catastrophic failure of the pipe, a reliable, cost-effective method is needed for monitoring and reporting third-party contact events. The impressed alternating cycle current (IACC) pipeline monitoring method consists of impressing electrical signals on the pipe by generating a time-varying voltage between the pipe and the soil at periodic locations where pipeline access is available. The signal voltage between the pipe and ground is monitored continuously at receiving stations located some distance away. Third-party contact to the pipe that breaks through the coating changes the signal received at the receiving stations. In this project, the IACC monitoring method is being developed, tested, and demonstrated. Work performed to date includes (1) a technology assessment, (2) development of an IACC model to predict performance and assist with selection of signal operating parameters, (3) Investigation of potential interactions with cathodic protection systems, and (4) experimental measurements on buried pipe at a test site as well as on an operating pipeline. Initial results showed that IACC signals could be successfully propagated over a distance of 3.5 miles, and that simulated contact can be detected up to a distance of 0.7 mile. Unexpected results were that the electrical impedance from the operating pipelines to the soil was very low and, therefore, the changes in impedance and signal resulting from third-party contact were unexpectedly low. Future work will involve further refinement of the method to resolve the issues with small signal change and additional testing on operating pipelines.

Research Organization:
Southwest Research Institute (US)
Sponsoring Organization:
(US)
DOE Contract Number:
FC26-03NT41878
OSTI ID:
839568
Resource Relation:
Other Information: PBD: 1 Apr 2005
Country of Publication:
United States
Language:
English