skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Integrated computer control system status monitor simulation

Technical Report ·
DOI:https://doi.org/10.2172/8308· OSTI ID:8308

Simulations of the Integrated Computer Control System (ICCS) status monitor framework have been performed. The results provide confidence that the requirements related to the framework can be met. The simulation was done by using the SIMPROCESS discrete-event-modeling tool. This document describes the results of the simulations. The requirements related to the status monitor framework are the following: (1) 1 graphical user interface (GUI) per workstation supports 10 status updates per second. (2) Broad-view control system status updates can be received in less than 10 seconds in the expected configuration of the ICCS for NIF deployment.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Organization:
USDOE Office of Defense Programs (DP)
DOE Contract Number:
W-7405-Eng-48
OSTI ID:
8308
Report Number(s):
UCRL-ID-133147; 39DP02000; 98-ERD-065; ON: DE00008308
Country of Publication:
United States
Language:
English