Decommissioning Project of Bohunice A1 NPP
The first (pilot) nuclear power plant A1 in the Slovak Republic, situated on Jaslovske Bohunice site (60 km from Bratislava) with the capacity of 143 MWel, was commissioned in 1972 and was running with interruptions till 1977. A KS 150 reactor (HWGCR) with natural uranium as fuel, D2O as moderator and gaseous CO2 as coolant was installed in the A1 plant. Outlet steam from primary reactor coolant system with the temperature of 410 C was led to 6 modules of steam generators and from there to turbine generators. Refueling was carried out on-line at plant full power. The first serious incident associated with refueling occurred in 1976 when a locking mechanism at a fuel assembly failed. The core was not damaged during that incident and following a reconstruction of the damaged technology channel, the plant continued in operation. However, serious problems were occurring with the integrity of steam generators (CO2 gas on primary side, water and steam on secondary side) when the plant had to be shut down frequently due to failures and subsequent repairs. The second serious accident occurred in 1977 when a fuel assembly was overheated with a subsequent release of D2O into gas cooling circuit due to a human failure in the course of replacement of a fuel assembly. Subsequent rapid increase in humidity of the primary system resulted in damages of fuel elements in the core and the primary system was contaminated by fission products. In-reactor structures had been damaged, too. Activity had penetrated also into certain parts of the secondary system via leaking steam generators. Radiation situation in the course of both events on the plant site and around it had been below the level of limits specified. Based on a technical and economical justification of the demanding character of equipment repairs for the restoration of plant operation, and also due to a decision made not to continue with further construction of gas cooled reactors in Czechoslovakia, a decision was made in 1977 to terminate plant operation. The decision on the A1 plant decommissioning was issued in 1979.
- Research Organization:
- VUJE Trnava Inc. (SK)
- Sponsoring Organization:
- none (US)
- OSTI ID:
- 828453
- Resource Relation:
- Conference: Waste Management 2002 Symposium, Tucson, AZ (US), 02/24/2002--02/28/2002; Other Information: PBD: 26 Feb 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
Geo-polymer solidification technology approved by Czech / Slovak nuclear authority to immobilise NPP resins and sludge waste - 15555
Thermal annealing of the reactor pressure vessel NPP Unit 2 in Jaslovske Bohunice for its radiation embrittlement regeneration
Related Subjects
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
BOHUNICE A-1 REACTOR
COOLANTS
DECOMMISSIONING
FISSION PRODUCTS
FUEL ELEMENTS
GAS COOLED REACTORS
GAS COOLING
NATURAL URANIUM
NUCLEAR POWER PLANTS
SLOVAKIA
STEAM GENERATORS
WASTE MANAGEMENT