Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-155) - Blind Slough Restoration Project

Technical Report ·
DOI:https://doi.org/10.2172/827555· OSTI ID:827555
 [1]
  1. Bonneville Power Administration (BPA), Portland, OR (United States)
This project proposes to restore tidal connection between the Columbia River Estuary and Blind Slough through the replacement and/or installation of culverts, installation of water control devices, breaching of dikes, and channel enhancement. These enhancements would restore connectivity to approximately ten (10) miles of slough channels previously isolated from tidal influence due to dikes, road crossings, and constrained culverts.
Research Organization:
Bonneville Power Administration (BPA), Portland, OR (United States)
Sponsoring Organization:
USDOE Office of NEPA Policy and Assistance (EH-42)
OSTI ID:
827555
Report Number(s):
DOE/EIS-0265/SA--155
Country of Publication:
United States
Language:
English