Digital control for the condensate system in a combined cycle power plant
Conference
·
OSTI ID:82752
- Inst. de Investigaciones Electricas, Cuernavaca (Mexico). Div. Sistems de Control
This paper presents the highlights by means of which development, installation and start up of the digital control system (DCS)for the condenser and hotwell (condensate system) were performed. This system belongs to the distributed control system installed by the Instituto de Investigaciones Electricas (IIE) at the Combined Cycle Power Plant in Gomez Palacio (GP), Durango, Mexico, during the February-March period, in 1993. The main steps for development of the condenser and hotwell control system include: process modeling, definition of control strategies, algorithms, design and software development, PC simulation tests, laboratory tests with an equipment similar to the one installed at the GP Power Plant, installation, and finally, start up, which was a joint effort with the GP Power Plant engineering staff.
- OSTI ID:
- 82752
- Report Number(s):
- CONF-941007--; ISBN 0-7918-1382-7
- Country of Publication:
- United States
- Language:
- English
Similar Records
A conceptual scheme of a digital communications network of integrated services applied to a national power grid
The geothermal diploma program at the Universidad Autonoma De Baja, California a review from 1983 to 1994
Reservoir Simulation on the Cerro Prieto Geothermal Field: A Continuing Study
Journal Article
·
Sun May 01 00:00:00 EDT 1983
· IEEE Trans. Power Appar. Syst.; (United States)
·
OSTI ID:6105987
The geothermal diploma program at the Universidad Autonoma De Baja, California a review from 1983 to 1994
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:175595
Reservoir Simulation on the Cerro Prieto Geothermal Field: A Continuing Study
Conference
·
Wed Dec 14 23:00:00 EST 1983
·
OSTI ID:889741