The Belgoprocess Strategy Relating to the Management of Materials from Decommissioning
Conference
·
OSTI ID:825979
Belgium started its nuclear program quite early. The first installations were constructed in the fifties, and presently, more than 55 % of the Belgian electricity production is provided by nuclear power plants. After 30 years of nuclear experience, Belgium started decommissioning of nuclear facilities in the eighties with two main projects: the BR3-PWR plant and the Eurochemic reprocessing plant. The BR3-decommissioning project is carried out at the Belgian Nuclear Research Centre, while the decommissioning of the former Eurochemic reprocessing plant is managed and operated by Belgoprocess n.v., which is also operating the centralized waste treatment facilities and the interim storage for Belgian radioactive waste. Some fundamental principles have to be considered for the management of materials resulting from the decommissioning of nuclear installations, equipment and/or components, mainly based on the guidelines of the ''IAEA-Safety Fundamentals. The Principles of Radioactive Waste Management. Safety Series No. 111-F, IAEA, Vienna, 1995'' with respect to radioactive waste management. Two of the fundamental principles indicated in this document are specifically dealing with the strategy for the management of materials from decommissioning, ''Generation of radioactive waste shall be kept to the minimum practicable'' (seventh principle), and ''Radioactive waste shall be managed in such a way that it will not impose undue burdens on future generations'' (fifth principle). Based on these fundamental principles, Belgoprocess has made a straightforward choice for a strategy with minimization of the amount of materials to be managed as radioactive waste. This objective is obtained through the use of advanced decontamination techniques and the unconditional release of decontaminated materials. Unconditionally released materials are recycled, such as i.e., metal materials that are removed to conventional melting facilities, or are removed to conventional industrial disposal sites if they have no remaining value. In order to achieve these objectives, Belgoprocess uses techniques and equipment that enable the high degrees of decontamination to be obtained, while based on commercially available technology. As an example, for concrete surfaces, where the contamination has not penetrated deeply, significant improvement in operation efficiency was achieved when developing dry hand held and automated floor and wall shaving systems as an alternative for scabbling. As it was also shown that it is economically interesting to decontaminate metal components to unconditional release levels using dry abrasive blasting techniques, an industrial automated dry abrasive blasting unit was installed in the Belgoprocess central decontamination infrastructure. Moreover, a specific facility was developed and operations started for taking representative samples and monitoring concrete material in view of the final demolition and unconditional release of remaining structures of buildings after completing all dismantling and decontamination work.
- Research Organization:
- Belgoprocess, n. v. Dessel (BE)
- Sponsoring Organization:
- none (US)
- OSTI ID:
- 825979
- Country of Publication:
- United States
- Language:
- English
Similar Records
Abrasive blasting, a technique for the industrial decontamination of metal components and concrete blocks from decommissioning to unconditional release levels
Know-how and experience of the decommissioning of the Eurochemic reprocessing plant
Belgian regulatory framework for decontamination and decommissioning - lessons learned and new initiatives
Conference
·
Sun Jul 01 00:00:00 EDT 2007
·
OSTI ID:21156395
Know-how and experience of the decommissioning of the Eurochemic reprocessing plant
Conference
·
Mon Jul 01 00:00:00 EDT 2013
·
OSTI ID:22535254
Belgian regulatory framework for decontamination and decommissioning - lessons learned and new initiatives
Conference
·
Mon Jul 01 00:00:00 EDT 2013
·
OSTI ID:22535265
Related Subjects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
DECOMMISSIONING
EXPLOSIVE FRACTURING
MANAGEMENT
NUCLEAR FACILITIES
NUCLEAR POWER PLANTS
RADIOACTIVE WASTE MANAGEMENT
RADIOACTIVE WASTES
RECOMMENDATIONS
WASTE MANAGEMENT
WASTE PROCESSING
WASTE STORAGE
WASTES
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
DECOMMISSIONING
EXPLOSIVE FRACTURING
MANAGEMENT
NUCLEAR FACILITIES
NUCLEAR POWER PLANTS
RADIOACTIVE WASTE MANAGEMENT
RADIOACTIVE WASTES
RECOMMENDATIONS
WASTE MANAGEMENT
WASTE PROCESSING
WASTE STORAGE
WASTES