Transport construction status and commissioning plans
Conference
·
OSTI ID:82532
- and others
Installation of the PEP-II electron and positron Injection beamlines in the SLAC linac housing is now underway. Utilization of the existing high power, low emittance beams available at SLAC required that a great portion of the systems for pulsed extraction and transport of 9.0 GeV electrons and 3.1 GeV positrons for injection into the PEP-II rings will reside in the existing linac housing. Approximately 4.7 kilometers of these beamlines will be completed during the summer of 1995. All components, including orbit correctors and diagnostic instruments, required for extraction and transport of the electron beam will be in place and ready for commissioning as soon as this fall. The positron transport line in the housing will also be complete except for the pulsed extraction system. These systems are described, along with the status of the construction and installation of the important subsystems such as magnets and power supplies, vacuum systems, instrumentation and controls. The plan for commissioning is discussed.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-76SF00515; AC03-76SF00098
- OSTI ID:
- 82532
- Report Number(s):
- SLAC-PUB--95-6812; CONF-950512--188; LBL--37045; ON: DE95014650
- Country of Publication:
- United States
- Language:
- English
Similar Records
The Optical Design of the PEP-II Injection Beamlines
1997 Annual Site Environmental Report (ASER)
The SLAC Linac During the PEP-II Era
Technical Report
·
Thu May 22 20:00:00 EDT 2003
·
OSTI ID:813179
1997 Annual Site Environmental Report (ASER)
Technical Report
·
Wed Sep 30 20:00:00 EDT 1998
·
OSTI ID:10129
The SLAC Linac During the PEP-II Era
Technical Report
·
Tue Apr 06 20:00:00 EDT 1999
·
OSTI ID:10050