skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Radiation shielding calculations for MuCool test area at Fermilab

Technical Report ·
DOI:https://doi.org/10.2172/824355· OSTI ID:824355

The MuCool Test Area (MTA) is an intense primary beam facility derived directly from the Fermilab Linac to test heat deposition and other technical concerns associated with the liquid hydrogen targets being developed for cooling intense muon beams. In this shielding study the results of Monte Carlo radiation shielding calculations performed using the MARS14 code for the MuCool Test Area and including the downstream portion of the target hall and berm around it, access pit, service building, and parking lot are presented and discussed within the context of the proposed MTA experimental configuration.

Research Organization:
Fermi National Accelerator Laboratory, Batavia, IL (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
824355
Report Number(s):
FERMILAB-TM-2248; TRN: US0402021
Resource Relation:
Other Information: PBD: 26 May 2004
Country of Publication:
United States
Language:
English