Environmental Assessment and Finding of No Significant Impact: Presidential Permit Applications for Baja California Power, Inc. and Sempra Energy Resources

Technical Report ·
DOI:https://doi.org/10.2172/823513· OSTI ID:823513
In separate actions, Sempra Energy Resources (SER) and Baja California Power, Inc. (BCP) have applied to the US Department of Energy (DOE) for Presidential permits pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 CFR Section 205.320 et seq. (2000), to construct, operate, maintain, and connect electric power transmission facilities crossing the international border between the Us and Mexico. SER and BCP each propose constructing separate new double-circuit, 230,000 volt (230 kV) transmission lines extending about six miles south from the Imperial Valley Substation (IV Substation), owned and operated by San Diego Gas and Electric Company (SDG and E), to the US/Mexico international border. In each case, the objective is to connect the proposed transmission lines to natural gas fueled electric generating plants being constructed in Mexico for the purpose of importing electrical power into the US onto the southern California electrical grid. The proposed transmission lines would traverse about six miles of federal land administered by the US Department of the Interior's Bureau of Land Management (BLM).
Research Organization:
U.S. Department of Energy, Fossil Energy (US)
Sponsoring Organization:
USDOE Office of NEPA Policy and Assistance (EH-42) (US)
OSTI ID:
823513
Report Number(s):
DOE/EA-1391