Superstructures: First Cold Test and Future Applications
Conference
·
OSTI ID:820177
Superstructures, chains of superconducting multi-cell cavities (subunits) connected by e/2 long tube(s) have been proposed as an alternative layout for the TESLA main accelerator [1]. After three years of preparation, two superstructures, each made of two weakly coupled superconducting 7-cell subunits driven by a single Fundamental Power Coupler (FPC), have been installed in the Tesla Test Facility linac for beam tests. Energy stability, HOM damping, frequency and field adjustment methods were tested. The measured results confirmeSuperstructures, chains of superconducting multi-cell cavities (subunits) connected by e/2 long tube(s) have been proposed as an alternative layout for the TESLA main accelerator [1]. After three years of preparation, two superstructures, each made of two weakly coupled superconducting 7-cell subunits driven by a single Fundamental Power Coupler (FPC), have been installed in the Tesla Test Facility linac for beam tests. Energy stability, HOM damping, frequency and field adjustment methods were tested. The measured results confirmed expectation on the superstructure performance and proved that an alternative layout for the 800 GeV upgrade of the TESLA collider is feasible. We report on the test and give here an overview of its results. The tests confirmed very good damping of HOMs in superstructures and thus has opened a possible new application of this concept to high current energy recovery machines. We have built two 1.5 GHz copper models of two superstructures: 2x5-cells and 2x2-cells to prove further improvement of HOM damping. This contribution presents also measured results on these models. d expectations on the superstructure performance and proved that an alternative layout for the 800 GeV upgrade of the TESLA collider is feasible. We report on the test and give here an overview of its results.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 820177
- Report Number(s):
- JLAB-ACC-03-211; DOE/ER/40150-2592
- Country of Publication:
- United States
- Language:
- English
Similar Records
Cold- and Beam Test of the First Prototypes of the Superstructure for the TESLA Collider
Test of Two NB Superstructure Prototypes
Analysis of the HOM Damping with Modulated Beam in the First Prototype of Superstructure
Technical Report
·
Fri Aug 08 00:00:00 EDT 2003
·
OSTI ID:815257
Test of Two NB Superstructure Prototypes
Technical Report
·
Fri Apr 16 00:00:00 EDT 2004
·
OSTI ID:826870
Analysis of the HOM Damping with Modulated Beam in the First Prototype of Superstructure
Technical Report
·
Fri Aug 08 00:00:00 EDT 2003
·
OSTI ID:815254