Upgrade to Cryomodule Test Facility at Jefferson Lab
Conference
·
OSTI ID:816434
The cryomodule test facility (CMTF) was originally implemented in the late eighties for testing of a small fraction of the cryomodules during the production run for the Continuous Electron Beam Accelerator Facility [1]. The original system was built using a dedicated wiring scheme and a pair of 2 kW, 1497 MHz RF sources. This dedicated system made it difficult to test cryomodules and other RF structures of non-standard configuration. Additionally, due to a previously installed cyclotron, there were static magnetic fields in excess of 6 Gauss within the test cave, which limited the capability of the facility when measuring the quality factor of superconducting cavities. Testing of the Spallation Neutron Source cryomodules as well as future upgrades to the CEBAF accelerator necessitated that the facility be reconfigured to be flexible both with respect to RF source power and cryomodule wiring configuration. This paper will describe the implementation of a generalized wiring scheme t hat is easily adapted to different cryomodule configurations. It will also describe the capabilities of the LabView based low level RF controls and the related data acquisition systems currently being used to test cryomodules and related hardware. The high power RF source capabilities will be described. The magnetic shielding put in place in order to reduce the ambient magnetic file to levels below 50 mGauss will also be described.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 816434
- Report Number(s):
- JLAB-ACE-03-188; DOE/ER/40150-2552
- Country of Publication:
- United States
- Language:
- English
Similar Records
Low Level RF System for Jefferson Lab Cryomodule Test Facility
Cryomodule Test Stand Reduced-Magnetic Support Design At Fermilab
Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes
Conference
·
Thu May 01 00:00:00 EDT 2003
·
OSTI ID:811226
Cryomodule Test Stand Reduced-Magnetic Support Design At Fermilab
Conference
·
Tue May 31 20:00:00 EDT 2016
· No journal information
·
OSTI ID:1271294
Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes
Conference
·
Thu Jul 01 00:00:00 EDT 2004
·
OSTI ID:838711