skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Installing and Running AIM 2.3.1 in a Clustered Server Production Environment

Conference ·
OSTI ID:815594

High availability and redundancy were required for a 24/7 technical baseline at a nuclear production facility. Process engineering, operations, and maintenance all had to connect to the AIM workflow and data management system at the plant. 24-hour availability and 100 percent data integrity were requirements. AIM 2.3.1 satisfied these needs by running in a clustered environment, using shared RAID 5 data storage installed with Oracle Fail Safe on clustered WinNT 4.0 Servers. Order of installation was critical for successful operation. The system has been running in production for 12 months with minimal downtime, and zero loss of data.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
815594
Report Number(s):
WSRC-MS-2002-00979; TRN: US0304664
Resource Relation:
Conference: International Process & Power 2003 Conference, Las Vegas, NV (US), 09/24/2003--09/26/2003; Other Information: PBD: 11 Sep 2003
Country of Publication:
United States
Language:
English