Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Thermionic RF Gun and Linac Pre-Injector for SPEAR3

Technical Report ·
DOI:https://doi.org/10.2172/815262· OSTI ID:815262
Preparations are underway to upgrade the Spear2 to the third generation light source. Installation of all the subsystems will start in April 2003. Although the Spear3 RF system is entirely different from the present form, the pre-injector gun/linac and booster synchrotron will remain the same even after the upgrade. The thermionic rf gun reliability and stability are to be improved to inject 500 mA of stored current in shortest possible time. When a top-up mode is enforced, where the stored beam decay is replenished to maintain the constant current and thus constant light intensity, the Spear3 will take injection every few minutes. In that case the gun, linac, and booster must stay on at all times. In this report we will describe some improvements made on the gun and linac in the recent past, as well as their present performance and future upgrade to be made.
Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Science (US)
DOE Contract Number:
AC03-76SF00515;
OSTI ID:
815262
Report Number(s):
SLAC-PUB-10118
Country of Publication:
United States
Language:
English

Similar Records

The SPEAR Injector RF Gun and Linac Performance
Technical Report · Wed Aug 23 20:00:00 EDT 2000 · OSTI ID:763858

Booster Synchrotron RF System Upgrade for SPEAR3
Conference · Thu Jul 05 20:00:00 EDT 2012 · Conf.Proc.C100523:WEPEA075,2010 · OSTI ID:1045177

Spear2 RF Operation: a Bridge to Spear3
Technical Report · Tue Aug 13 20:00:00 EDT 2002 · OSTI ID:799914