Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PERFORMANCE OF THE DIII-D SYSTEM

Conference ·
OSTI ID:814012
A271 PERFORMANCE OF THE DIII-D SYSTEM. Three 110 GHz gyrotrons with nominal output power of 1 MW each have been installed and are operational on the DIII-D tokamak. All three gyrotrons were built by Communications and Power Industries (CPI). The CPI gyrotrons utilize a single disc CVD (chemical-vapor-deposition) diamond window that employs water cooling around the edge of the disc. Calculations predict that the CVD diamond window should be capable of full 1 MW cw operation, which is supported by IR camera measurements that show the window reaching equilibrium after 2.5 s. All gyrotrons are connected to the tokamak by low-loss-windowless evacuated transmission line using circular corrugated waveguide for propagation in the HE{sub 11} mode. Each waveguide system incorporates a two-mirror launcher, which can steer the rf beam poloidally from the center to the outer edge of the plasma. Results obtained using the DIII-D ECH systems will be reported.
Research Organization:
GENERAL ATOMICS (US)
Sponsoring Organization:
(US)
DOE Contract Number:
AC03-99ER54463
OSTI ID:
814012
Country of Publication:
United States
Language:
English

Similar Records

The DIII-D 3 MW, 110 GHz ECH System
Conference · Thu Jul 01 00:00:00 EDT 1999 · OSTI ID:766946

The Upgrade of the DIII-D GHz ECH System to 6 MW
Conference · Sun Oct 31 23:00:00 EST 1999 · OSTI ID:766687

The DIII-D 3 MW, 110 GHz ECH system
Journal Article · Mon Sep 20 00:00:00 EDT 1999 · AIP Conference Proceedings · OSTI ID:20216718