Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The BaBar Event Building and Level-3 Trigger Farm Upgrade

Technical Report ·
DOI:https://doi.org/10.2172/813181· OSTI ID:813181
The BaBar experiment is the particle detector at the PEP-II B-factory facility at the Stanford Linear Accelerator Center. During the summer shutdown 2002 the BaBar Event Building and Level-3 trigger farm were upgraded from 60 Sun Ultra-5 machines and 100MBit/s Ethernet to 50 Dual-CPU 1.4GHz Pentium-III systems with Gigabit Ethernet. Combined with an upgrade to Gigabit Ethernet on the source side and a major feature extraction software speedup, this pushes the performance of the BaBar event builder and L3 filter to 5.5kHz at current background levels, almost three times the original design rate of 2kHz. For our specific application the new farm provides 8.5 times the CPU power of the old system.
Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Science (US)
DOE Contract Number:
AC03-76SF00515;
OSTI ID:
813181
Report Number(s):
SLAC-PUB-9666
Country of Publication:
United States
Language:
English

Similar Records

Rapid 3D Track Reconstruction with the BaBar Trigger Upgrade
Technical Report · Sun May 23 20:00:00 EDT 2004 · OSTI ID:826940

Measurements of Rare B Decays at BABAR
Technical Report · Tue Mar 04 19:00:00 EST 2003 · OSTI ID:812955

BaBar Level 1 Drift Chamber Trigger Upgrade
Technical Report · Tue Nov 19 19:00:00 EST 2002 · OSTI ID:808661