PEP-II Alignment
- SLAC
The PEP-II Asymmetric B-factory consists of two independent storage rings, one located atop the other in the 2200m-circumference PEP tunnel. The high-energy ring, which stores a 9-GeV electron beam, is an upgrade of the existing PEP collider. It re-utilizes all of the PEP magnets and incorporates a state-of-the-art copper vacuum chamber and a new RF system capable of supporting a one-amp stored beam. The low-energy ring, which stores 3.1-GeV positrons, is new construction. Injection is achieved by extracting electrons and positrons at collision energies from the SLC and transporting them each in a dedicated bypass line. The low-emittance SLC beams will be used for the injection process.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (US)
- Sponsoring Organization:
- USDOE Office of Science (US)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 813117
- Report Number(s):
- SLAC-PUB-9825
- Country of Publication:
- United States
- Language:
- English
Similar Records
The SLAC Linac During the PEP-II Era
The proposed injection system for an asymmetric B Factory in the PEP tunnel
The Optical Design of the PEP-II Injection Beamlines
Technical Report
·
Wed Apr 07 00:00:00 EDT 1999
·
OSTI ID:10050
The proposed injection system for an asymmetric B Factory in the PEP tunnel
Conference
·
Wed May 01 00:00:00 EDT 1991
·
OSTI ID:5805544
The Optical Design of the PEP-II Injection Beamlines
Technical Report
·
Fri May 23 00:00:00 EDT 2003
·
OSTI ID:813179