ANALYSIS OF CORROSION PRODUCT RETRIEVED FROM THE PRIMARY TANK WALL IN THE ANNULUS OF TANK 241-AY-102
- CH2M
Corrosion product from the annulus side of the double-shell tank 241-AY-102 primary wall was retrieved and analyzed. The analyses indicated that the tank wall was wetted with water leading to corrosion. The water source was quite likely the ingress of water from an external source and condensation of moisture during the long annulus ventilation system shutdowns. Corrosion of the primary tank wall in the annulus of double-shell tank (DST) 241-AY-102 was observed during the review of annulus videos of the tank in year 2001. This resulted in the issuance of an occurrence report, RP-CHG-TANKFARM-2001-0106. The occurrence report required collection and evaluation of the corrosion product to determine the cause of such corrosion. Therefore, a corrosion product sample was collected from the annulus side of the primary wall through Riser 80 in February 2003. The sample was scanned by Operational Health Physics and found to contain no radioactivity. The sample was then released and transmitted to ChemMet, Ltd , PC, for analyses. The present report discusses the types of analyses performed and the results of these analyses from ChemMet, Ltd , PC (Divine 2003) along with conclusions and recommendations. The letter report from ChemMet, Ltd, PC is attached.
- Research Organization:
- CH2M (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 812342
- Report Number(s):
- RPP-15758, Rev.0; EDT-633357
- Country of Publication:
- United States
- Language:
- English
Similar Records
Evaluation of sodium nitrite addition with tank 241-AY-102 waste
Independent Review of Tank 241-AY-101 Fitness for Service
Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak
Technical Report
·
Mon Oct 29 23:00:00 EST 2001
·
OSTI ID:807482
Independent Review of Tank 241-AY-101 Fitness for Service
Technical Report
·
Thu Feb 27 23:00:00 EST 2003
·
OSTI ID:15010108
Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak
Conference
·
Wed Nov 13 23:00:00 EST 2013
·
OSTI ID:1105990