Characterization and irradiation program: extended-burnup gadolina lead test assembly (Mark GdB)
This advanced fuel assembly uses a UO/sub 2/-Gd/sub 2/O/sub 3/ fuel burnable-absorber mixture along with other state-of-the-art fuel performance and uranium utilization-enhancing design features that include annular pellets, annealed guide tubes, Zircaloy intermediate grids, and a removable upper end fitting. Goal of the program is to extend the burnup of pressurized water reactor fuel assemblies to 50,000 MWd/mtU batch average burnup. To achieve this goal, five lead test assemblies have been designed, manufactured, characterized, and inserted for irradiation in Oconee Unit 1 cycle 8. One lead test assembly will receive 13,989 MWd/mtU burnup by its discharge at the end of cycle 8. Three of the four remaining lead test assemblies will receive approximately 45,000 MWd/mtU burnup by their discharge at the end of cycle 10. The fourth lead test assembly will receive approximately 58,000 MWd/mtU before being discharged at the end of cycle 11. The lead test assemblies and their constituent components have been extensively characterized to acquire a beginning-of-life data base to compare with future post-irradiation examination results and thereby determine the irradiation performance of the assemblies and their components. This report contains a description of the lead test assemblies and the pre-irradiation characterization data. Also, the plans for irradiating and examining these assemblies are discussed.
- Research Organization:
- Babcock and Wilcox Co., Lynchburg, VA (USA)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-78ET34212; AC02-78ET34213
- OSTI ID:
- 8122002
- Report Number(s):
- DOE/ET/34212-44; BAW-1817; ON: DE85005147
- Country of Publication:
- United States
- Language:
- English
Similar Records
Poolside examination of gadolinia lead test assemblies after two cycles of irradiation
Development of an extended-burnup Mark B design. First semi-annual progress report, July-December 1978. Report BAW-1532-1. [PWR]
Qualification of the B and W Mark B fuel assembly for high burnup. Third semi-annual progress report, July-December 1979
Technical Report
·
Sat Oct 31 23:00:00 EST 1987
·
OSTI ID:5626941
Development of an extended-burnup Mark B design. First semi-annual progress report, July-December 1978. Report BAW-1532-1. [PWR]
Technical Report
·
Mon Oct 01 00:00:00 EDT 1979
·
OSTI ID:5194213
Qualification of the B and W Mark B fuel assembly for high burnup. Third semi-annual progress report, July-December 1979
Technical Report
·
Fri Feb 29 23:00:00 EST 1980
·
OSTI ID:6869098
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
ACTINIDE COMPOUNDS
BURNABLE POISONS
BURNUP
CHALCOGENIDES
ENRICHED URANIUM REACTORS
FUEL ASSEMBLIES
FUEL MANAGEMENT
GADOLINIUM COMPOUNDS
GADOLINIUM OXIDES
MATERIALS
NEUTRON ABSORBERS
NUCLEAR POISONS
OCONEE-1 REACTOR
OXIDES
OXYGEN COMPOUNDS
PERFORMANCE TESTING
POWER REACTORS
PWR TYPE REACTORS
RARE EARTH COMPOUNDS
REACTOR MATERIALS
REACTORS
TESTING
URANIUM COMPOUNDS
URANIUM DIOXIDE
URANIUM OXIDES
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
ACTINIDE COMPOUNDS
BURNABLE POISONS
BURNUP
CHALCOGENIDES
ENRICHED URANIUM REACTORS
FUEL ASSEMBLIES
FUEL MANAGEMENT
GADOLINIUM COMPOUNDS
GADOLINIUM OXIDES
MATERIALS
NEUTRON ABSORBERS
NUCLEAR POISONS
OCONEE-1 REACTOR
OXIDES
OXYGEN COMPOUNDS
PERFORMANCE TESTING
POWER REACTORS
PWR TYPE REACTORS
RARE EARTH COMPOUNDS
REACTOR MATERIALS
REACTORS
TESTING
URANIUM COMPOUNDS
URANIUM DIOXIDE
URANIUM OXIDES
WATER COOLED REACTORS
WATER MODERATED REACTORS