Low Power and Shutdown Risk Assessment Benchmarking Study
Technical Report
·
OSTI ID:812194
(B204)Probabilistic risk assessment (PRA) insights are now used by the United States Nuclear Regulatory Commission (USNRC) to confirm the level of safety for plant operations and to justify changes in nuclear power plant operating requirements, both on an exception basis and as changeds to a plant's licensing basis. This report examines qualitative and quantitative risk assessments during shutdown plant states, providing feedback to utilities in the use of qualitative models for outage risk management, and also providing input to the development of the American Nuclear Society (ANS) Low Power and Shutdown PRA Standard.
- Research Organization:
- EPRI
- Sponsoring Organization:
- USDOE Office of Nuclear Energy, Science and Technology (NE)
- DOE Contract Number:
- FC03-00NE22796
- OSTI ID:
- 812194
- Report Number(s):
- 1003465
- Country of Publication:
- United States
- Language:
- English
Similar Records
Handbook of methods for risk-based analysis of technical specifications
Risk contribution from low power, shutdown, and other operational modes beyond full power
Risk contribution from low power, shutdown, and other operational modes beyond full power
Conference
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:373936
Risk contribution from low power, shutdown, and other operational modes beyond full power
Technical Report
·
Fri Mar 31 23:00:00 EST 1995
·
OSTI ID:90935
Risk contribution from low power, shutdown, and other operational modes beyond full power
Conference
·
Sat Dec 31 23:00:00 EST 1994
·
OSTI ID:10107856